Install & Commission
Install and commission Tigo and third party equipment
Install
empty
- Power Supply Replacement Requirements, data loggers MMU, CC and CCA
- Replacing Optimizer, changing the Serial Number
- TS4 Installation Manuals
- Installation Training Videos
- Technical Documentation - Installation Manuals and Quick Start Guides
- Can I optimize my system without a TAP, CCA, or a connection to the Internet?
Commission
empty
- Commissioning a TS4 System - Getting Started
- Add a System Owner using EI App
- Configure Communication (Network and Start Discovery)
- Commissioning a System with the Tigo Energy Intelligence
- Create and Edit System - Using EI Portal (Desktop)
- Create and Edit System - Using EI App (Mobile)
Using the Tigo EI (Energy Intelligence) App
How To Monitor non-Tigo equipment including Inverters, Meters and Weather Stations
empty
- Cloud Connect Advanced (CCA): Displaying (monitoring) Other Equipment Values - Inverters, Meter, etc.
- How-To: Setup and Monitor Modbus Connected Devices including Inverters, Meters & Sensors
- Supported RS-485 Devices
- Monitoring Setup for a GoodWe Inverter
- Monitor DTS 307 AC Revenue Grade Meter
- Monitor Rainwise PVmet Weather Station