Install & Commission
Install and commission Tigo and third party equipment
Commission (On-site)
TS4
empty
- TS4 Factory default functionality
- Are MC4 and MC4-Evo2 Connectors Compatible with Tigo TS4 Products?
- Is it permissible to run Tigo TS4 cables in a cable tray?
- Using Tigo’s Rapid Shutdown Solutions with the Sol-Ark Hybrid Inverters
- How to Install an RSS Transmitter Add-on Board
- TS4-F/TS4-2F: String Voltage Testing and Troubleshooting
Install
empty
- Communication Equipment Power Supply Overview
- MLPE (TS4/ES) - Updating a Serial Number after Replacement
- Technical Documentation - Where to find Installation Manuals and Quick Start Guides
- Can I run a TS4-A-O system without a TAP, CCA, or a connection to the Internet?
- Mounting the CCA Antenna in a Metal Enclosure
- Using the Cloud Connect Advanced Aux Port for Rapid Shutdown applications
Commission
empty
- Commissioning the Cloud Connect Advanced (CCA) - Getting Started
- Commissioning the Cloud Connect Advanced (CCA): Granting System Access
- Cloud Connect Advanced (CCA) Commissioning: Configure Communication
- Commissioning the Cloud Connect Advanced (CCA): Create and Edit a System - Using EI Portal (Desktop)
- Create and Edit a TS4 System - Using EI App (Mobile)
- Testing Generator Functionality after Commissioning
Using the Tigo EI (Energy Intelligence) App
How To Monitor non-Tigo equipment including Inverters, Meters and Weather Stations
empty
- Cloud Connect Advanced (CCA): Modbus Connected Devices (Inverters, Meters & Sensors)
- Cloud Connect Advanced: Supported RS-485 Devices
- Monitoring Setup for a GoodWe Inverter
- Monitor DTS 307 AC Revenue Grade Meter
- Monitor Rainwise PVmet Weather Station
- Monitor Shark AC Meters
Additional Installation and Commissioning Information
empty
- Important Notice: Behavior of TS4-X and TS4-A (725W) with Third-Party Inverters Using Integrated RSS Transmitters
- Tigo Integrated MLPE optimizers and Junction Box hardware information and pictures
- Safety Notice: TS4-X & TS4-A (725W) Ship ON - What Installers Must Know About Default Voltage State
- Procedure for Testing, Checking, or Disassembling a Tigo MLPE
- Tigo TS4 Key Hardware Guide
- How To use the Tigo Energy API