Greg Smith
Community Moderator
I have been in the industry since 2008 when I started as SMA America's technical trainer. I bid SMA farewell in 2015 and hopped over to sonnen, Inc. to help them launch their energy storage system in the U.S. In May of 2021, I transitioned to Tigo as the Technical Training Director. I am a huge fan of renewable energy, BBQ, and gaming. I am a published author and wrote an Amazon best seller about grid-tied lithium-ion storage.
- Total activity 310
- Last activity
- Member since
- Following 0 users
- Followed by 3 users
- Votes 90
- Subscriptions 178
Articles
Recent activity by Greg Smith-
How to install the Tigo Rapid Shutdown Button
This article explains installing the Tigo Rapid Shutdown (RSD) push button included with the EI Inverter. Video: How to Install the Tigo Rapid Shutdown Button Note: This button must be used with t...
-
How to activate the GO Cellular Kit
Use this document to activate the GO Cellular kit after it has been installed in the Tigo Inverter. Click here for the installation procedure. For installation assistance, refer to the Tigo Inverte...
-
EI Residential Solution: How to test Backup Mode after commissioning
This short process outlines the testing method for the EI Inverter, Battery, and ATS. It verifies the system successfully enters Backup during a grid outage, and returns to normal operating behavio...
-
Tigo Energy Meter Installation
Applications There are two applications for the Tigo Energy Meter: Application 1 Installation with the EI Inverter but without a Tigo EI ATS Application 2 Installation with the EI Inverter...
-
ESS Real Talk: Starting large loads
ed by 2 people Greg Smith 3 years ago One of the most common questions ESS designers have regarding ESS capabilities is whether the system can start large loads like air conditioners...
-
How to Install and Commission the GO Cellular Kit (US version)
The GO Cellular Kit adapter allows the Tigo EI Inverters to connect to cellular networks. The kit includes a 5-year prepaid plan. The Tigo EI System's communication priority is always WiFi, but if ...
-
TS4 Systems - Partial Deployment
This article expands upon the definition of Partial Deployment with TS4 systems. For a definition of other deployment options, see TS4 Systems - Methods of Deployment. Partial Deployment is defin...
-
Tigo Battery Sizing Tool
The Tigo EI Battery (US) Sizing Tool is for grid-tied residential systems and is divided into two sections: Load Entry fields Load Analysis Click HERE to download the tool. Click HERE to watc...
-
Tigo String Sizing Tool
The Tigo Solar Sizing Tool is designed to help you determine the number of modules per string and the number of strings the Tigo EI Inverter (US) will need to operate correctly. IMPORTANT The Ti...
-
Tigo EI Inverters on 208V Three Phase Service
All Tigo EI Inverter models (3.8, 7.6, 11.4 kW) are 208V and 240V compatible. Although the EI Inverters are single-phase, they can be used on a three-phase 208V AC panel. Pick two phases for the in...