Why has TIGO stopped reporting our production to SECTrade?

Comments

1 comment

  • Official comment
    Avatar
    Harry Cline
    Early Adopter

    Production credits are reported using 'Revenue Grade Meter' which need Internet service to report the power production and usage.

    Perhaps you changed something regarding your home network and/or Internet service so the Meter needs to be reconfigured to be able to use the Internet. Your installer can help you with this, or the Meter manufacturer.

Please sign in to leave a comment.