Different Orientations

Comments

2 comments

  • Avatar
    activ

    In this second case (6 modules for South and 6 modules for West and 100% optimization and one string on the same inverter) - is it sufficient one TAP or we need one item for West and one for South?

    0
  • Avatar
    Bob

    I have to be picky here. the first diagram that shows two configs, the left one labeled "selective deployment" and the right labeled "non-TS4 100% deployment." The right one shows yellow labels signifying TS4-Os and the caption says non-TS4. either diagram or caption needs to be fixed.

    0

Please sign in to leave a comment.